Renovation Updates
Updated 12/19/2024
Renovation Update
Interior Work:
- Installed ductwork, electrical conduit, and AV speakers in the lower level.
- Completed stairs from the lower level to the main level and added choir loft extensions.
- Framed ceilings in the classroom addition and finished grouting floors in bathrooms.
- Ran line sets for mini-split systems and installed roof drains.
Exterior Work:
- Applied a water barrier to the elevator shaft.
- Covered exterior sheeting with plastic to prevent moisture damage.
Fellowship Hall Routine During Renovation
To enable Paric and CLC to most effectively share the Fellowship Hall throughout the construction period, Paric is taking responsibility for the round tables, and we are responsible for the chairs. If they have taken the tables down during the week, they will set them back up before leaving on Friday. And we will make sure the chairs are re-stacked and out of their way after we use them on Sundays.
Here’s how you can help: If you arrive at Adult Forum before church or Fellowship after church and find that additional chairs are needed at the tables, please help set a few more out. And as you leave Fellowship, please help re-stack a few chairs over by the kitchen pass-through. This is definitely one of those tasks that goes much quicker with several people involved. THANK YOU!!
Protecting the Pews from Dust
Just as we have an arrangement with Paric regarding the tables and chairs in the fellowship hall during these construction months, we now have something similar for the sanctuary. After our Sunday services, we retrieve long sheets of heavy plastic from our boiler room and lay them over the top of the pews on each side. The pews then remain covered until Fri afternoon when Paric takes the plastic off in preparation for our weekend activities. We need about 6 volunteers each week right after church to spend a few minutes putting the plastic back on.